Central Water Commission (CWC)
The Central Water Commission is India’s apex technical body under the Ministry of Jal Shakti, responsible for the planning, development, and management of water resources. It oversees flood control, irrigation, hydropower, and dam safety, ensuring sustainable and efficient use of the nation’s water resources.
Central Water Commission (CWC)

CPCB E-Waste Manufacturer Registration form
Extended Producer Responsibility (EPR) of producers are regulated through grant of Registration Certificate and is

CPCB E-Waste Recycler Registration form
The CPCB E-Waste Recycler Registration Form, officially known as Form-1, is an application form issued by the Central Pollution Control Board (CPCB) under

CPCB E-Waste Refurbisher Registration form
The CPCB E-Waste Refurbisher Registration Form is a document required by entities that refurbish electronic waste (e-waste) in India,

CEA Registry Certificate Issuance
The CEA Registration Certificate Issuance refers to the process of obtaining a registration certificate from the Central Electricity Authority (CEA), under the Ministry of Power, Government of India.

A Certificate for Successful Commissioning (CSC)
A Certificate for Successful Commissioning (CSC) is an official document issued to confirm that a project, system, equipment, or facility has been..

Commissioning Certificate
A Commissioning Certificate is an official document issued upon the successful completion of the commissioning process for a system, equipment, or facility. Commissioning is a critical phase that involves inspecting, testing....

DPR Approval Process Monitoring System for Hydro Projects
The DPR Approval Process Monitoring System for Hydro Projects is an online platform developed by the Central Electricity Authority (CEA) of India to streamline and monitor the apprais...

Form A - Approval of Electrical Inspector
Form A - Approval of Electrical Inspector before commencement of supply of electricity to electrical installations under Regulation 45 of Central Electricity Authority (Measures Relating to Safety and Electric Supply) ..

Form C - Application for Statutory Periodical Inspection of the Electrical Installations
Form C is an application required for the statutory periodical inspection of electrical installations under Regulation 32 of the Central Electricity Authority ..

PTCC Clearance
PTCC Clearance (Power Telecom Coordination Committee Clearance) is a mandatory approval required in India for infrastructure projects that may interfere with power lines and telecommunication networks. This clearance ensures that any new ...

Power Charging permission for Industries
Power charging permission for industries is a critical regulatory requirement that ensures businesses can legally draw and utilize electrical power for their operations. Industries, whether manufacturing units, commerc...

Prior approval for installation of overhead transmission line (and dedicated transmission line)
Before installing an overhead transmission line or a dedicated transmission line, prior approval from ..

A Transmission Line Permit
A Transmission Line Permit is a crucial regulatory approval required for constructing and operating high-voltage power transmission lines. It ensures compliance with safety standards, environmental regulations, and land use policies while minimizing ...

Prior approval for installation of overhead transmission line (and dedicated transmission line)
Before installing an overhead transmission line or a dedicated transmission line, prior approval from ..