APPLICATION UNDER REGULATION 19.2 FOR ADDITIONAL GRANT OF GNA TO STUs
What is Approval of APPLICATION UNDER REGULATION 19.2 FOR ADDITIONAL GRANT OF GNA TO STUs
An Application under Regulation 19.2 for Additional Grant of GNA to STUs refers to a formal request made by a State Transmission Utility (STU) under the provisions of Regulation 19.2 of the Connectivity and General Network Access (GNA) Regulations, 2022, issued by the Central Electricity Regulatory Commission (CERC). The purpose of this application is to seek an increase in the previously granted General Network Access (GNA) to the Inter-State Transmission System (ISTS), as the existing GNA may no longer be sufficient to meet the transmission requirements of the state’s distribution companies or other embedded beneficiaries. Regulation 19.2 provides a mechanism for STUs to ensure that their power demand forecasts, system expansions, or new consumer connections can be adequately supported by the national grid infrastructure. The application typically includes data on the current GNA allocation, justification for the additional requirement, projected demand growth, and technical details supporting the request. This process ensures efficient and reliable electricity transmission across states while preventing network congestion and facilitating smooth power flow.
Who Can Apply for This Certificate?
Only the STU (State Transmission Utility) is authorized to apply under Regulation 19.2.
The STU applies on behalf of the distribution licensees, generators, or other entities connected within its state.
Other entities (like DISCOMs or embedded generators) cannot apply directly to the central agency; they must route their request through the respective STU.
Examples of STUs:
MSETCL – Maharashtra State Electricity Transmission Company Ltd.
GETCO – Gujarat Energy Transmission Corporation Ltd.
TANTRANSCO – Tamil Nadu Transmission Corporation Ltd.
KPTCL – Karnataka Power Transmission Corporation Ltd.
Documents Required for This License
- Proof of Ownership / Legal Occupancy
- Covering Letter
- Duly Filled Application Form (as per GNA Regulations, 2022)
- Existing GNA Approval Letters
- Justification for Additional GNA
- Power Demand Forecast (5–10 years)
- System Planning Study Report (Load flow, contingency analysis, etc.)
- Intra-State Transmission Expansion Plan
- Stakeholder Consent Letters (if applicable)
- Financial Commitment/Undertaking
- Authorization Letter
- Copies of Relevant Previous Correspondence (if any)
Act and Rules
Role of Shamkris and Process of APPLICATION UNDER REGULATION 19.2 FOR ADDITIONAL GRANT OF GNA TO STUs
Shamkris adopts a results-oriented approach to ensuring compliance with the mandatory requirements for obtaining the Application. With a simple and guided methodology, Shamkris helps organizations achieve the necessary application in a timely and cost-effective manner. Shamkris offers 100% support in advisory, guidance, and compliance, ensuring smooth processing for obtaining the application.
The Application acquisition process described below:
Advisory for the document required
Preparation of documents as per application & list of documents.
Certificate File
Inspection by the department if required
Certificate department
Certificate issued
Yearly Compliance if Applicable
Renewal when due
Who can issue the APPLICATION UNDER REGULATION 19.2 FOR ADDITIONAL GRANT OF GNA TO STUs

FAQ
Regulation 19.2 of the CERC GNA Regulations, 2022 allows State Transmission Utilities (STUs) to apply for additional General Network Access (GNA) beyond what has already been granted, to meet the growing transmission requirements of entities within the state.
Only the State Transmission Utility (STU) of a state is eligible to apply. Individual DISCOMs, generators, or consumers must route their requests through the STU.
General Network Access (GNA) is a non-discriminatory access right granted to eligible entities to use the Inter-State Transmission System (ISTS) for injecting or drawing power, without being tied to a specific source or destination.
STUs may need additional GNA due to:
Increase in state electricity demand.
Connection of new generation projects.
Requirement from distribution companies (DISCOMs).
System planning and load growth projections.
The application must typically include:
Details of existing GNA.
Quantum of additional GNA required.
Justification for the requirement.
Demand forecast and system studies.
List of beneficiaries (DISCOMs, embedded entities).
Supporting documents (such as SLDC confirmation).
The STU submits the application to the Central Transmission Utility of India Ltd. (CTUIL), which is the designated Implementing Agency for GNA.
Yes. CTUIL has prescribed a standard format for submitting GNA applications, which includes technical, commercial, and planning data.
The processing time depends on the completeness of the application and any required system studies. CTUIL generally follows timelines laid out in its procedures, often within 60 days.
Yes. There are application processing fees and transmission charges associated with GNA, as per CERC regulations.
Once granted, the STU can utilize the additional GNA for power transfer through ISTS, ensuring reliable and congestion-free power flow to the state or its entities.