Application for Extension of Letter of Permission (LOP) for EOU

What is Application for Extension of Letter of Permission (LOP) for EOU

Extension of Letter of Permission (LoP) for Export Oriented Units (EOUs) is applicable to units that require additional time to establish their plant, install machinery, or continue their approved export-oriented activities. EOUs are units committed to exporting their entire production of goods and services, subject to permissible Domestic Tariff Area (DTA) sales, and may undertake activities such as manufacturing, repair, reconditioning, software development, agriculture, biotechnology, floriculture, and other permitted sectors. The LoP/LoI is generally valid for 5 years and may be further extended by the Development Commissioner (DC) for another 5 years at a time, subject to applicable requirements.

Who Can Apply for Application for Extension of Letter of Permission (LOP) for EOU

  • Existing Export Oriented Units (EOUs) holding a valid Letter of Permission (LoP/LoI).
  • EOUs requiring additional time to construct or establish their plant.
  • EOUs requiring additional time for installation of machinery and equipment.
  • EOUs that need to continue their approved export-oriented activities beyond the existing LoP validity period.
  • Units requiring extension to complete their approved project or commence/expand operations.
  • The application is submitted to the concerned Development Commissioner (DC) as per the applicable EOU procedures.

Documents Required for this Application for Extension of Letter of Permission (LOP) for EOU

Act and Rules

Foreign Trade Policy
Guidelines For Sale / Advance Sale Of Goods In The Domestic Tariff Area (DTA) By EOU/EHTP/STP/BTP Units
Policy relating to EOUs, EHTPs, STPs and BTPs Schemes
Regulations and Guidelines for Recombinant DNA Research and Biocontainment, 2017
Guidelines for the conduct of Confined Field Trials of Regulated, Genetically Engineered (GE) Plants, 2008
Standard Operating Procedures (SOPs) for Confined Field Trials of Regulated, Genetically Engineered (GE) Plants, 2008
Environmental Risk Assessment of Genetically Engineered Plants: A Guide for Stakeholders, 2016
Guidelines for the Environmental Risk Assessment of Genetically Engineered Plants, 2016
Guidelines for the Safety Assessment of Foods Derived from Genetically Engineered Plants, 2008

Role of Shamkris and Process of Application for Extension of Letter of Permission (LOP) for EOU

Shamkris adopts a results-oriented approach to ensuring compliance with the mandatory requirements for obtaining the Application. With a simple and guided methodology, Shamkris helps organizations achieve the necessary application in a timely and cost-effective manner. Shamkris offers 100% support in advisory, guidance, and compliance, ensuring smooth processing for obtaining the application.

The Application acquisition process described below:

Advisory for the document required

Preparation of documents as per application & list of documents.

Certificate File

Inspection by the department if required

Certificate department

Certificate issued

Yearly Compliance if Applicable

Renewal when due

Who can issue Approval for Application for Extension of Letter of Permission (LOP) for EOU

FAQ

Extension of the validity period of an EOU’s Letter of Permission.

Existing EOUs holding a valid LoP/LoI.

 

For additional time to complete approved activities.

 

Yes, where additional time is needed for plant construction or machinery installation.

 

Generally, 5 years.

 

Yes, subject to applicable approval and conditions.

 

The concerned Development Commissioner (DC).

 

No, trading units are not covered under the EOU scheme.

 

LoP/LoI, extension request, progress report, machinery and performance details, and relevant compliance documents.

 

Before the existing LoP validity expires, wherever an extension is required.