Application for Authorization u/s 164 of Electricity Act, 2003 for Transmission Line

What is Application for Authorization u/s 164 of Electricity Act, 2003 for Transmission Line?

The relevant government authority may issue a written order authorizing the installation of electric lines, electrical infrastructure, or communication systems (such as telephonic or telegraphic networks) required for the efficient transmission of electricity or coordination of related activities. This authorization can be granted to public officers, licensed entities, or any other individuals or organizations involved in the electricity supply business under the provisions of this Act.

The authorization may include specific conditions or restrictions as deemed necessary by the government and will align with the regulations outlined in the Indian Telegraph Act, 1885. This includes granting powers similar to those held by telegraph authorities for the installation of telegraph lines and posts, whether for government-established or future telegraph systems.

The primary objective of such authorization is to ensure the seamless development and maintenance of critical infrastructure required for electricity transmission and communication networks. This is particularly important in remote or challenging terrains where such installations are essential for national development, economic growth, and public welfare. The government’s role in regulating these activities ensures that the infrastructure is developed in a coordinated and efficient manner, minimizing disruptions and maximizing utility.

Key Provisions

  1. Authorization Process: The government may grant specific powers to entities involved in electricity supply, enabling them to undertake necessary installations and maintenance activities.

  2. Conditions and Restrictions: The authorization may come with certain terms to ensure compliance with safety standards, environmental regulations, and public interest.

  3. Alignment with the Indian Telegraph Act, 1885: The powers granted under this authorization are analogous to those of telegraph authorities, ensuring uniformity in the execution of such projects.

Who Can Apply for This Application?

  • ISTS Transmission Licensees: Entities authorized to operate and maintain inter-state transmission systems.

  • Generating Companies: Particularly those developing dedicated transmission lines connected to ISTS substations.

Validity

The authorization does not have a fixed validity period and remains effective as long as the specified conditions are met.

Processing Time

The average time for obtaining this authorization ranges between 60 to 90 days, depending on the complexity of the project and compliance with regulatory requirements.

Role of Shamkris and Process of Application for Authorization u/s 164 of Electricity Act, 2003 for Transmission Line

Shamkris adopts a results-oriented approach to ensuring compliance with the mandatory requirements for obtaining the Application. With a simple and guided methodology, Shamkris helps organizations achieve the necessary application in a timely and cost-effective manner. Shamkris offers 100% support in advisory, guidance, and compliance, ensuring smooth processing for obtaining the application.

The Application acquisition process described below:

Advisory for the document required

Preparation of documents as per application & list of documents.

Application File

Inspection by the department if required

Application department

Application issued

Yearly Compliance if Applicable

Renewal when due

Who can issue the Application for Authorization u/s 164 of Electricity Act, 2003 for Transmission Line?

FAQ

This authorization allows entities to install electric lines, electrical infrastructure, or communication systems (like telephonic or telegraphic networks) necessary for efficient electricity transmission and coordination of related activities. It ensures the development of critical infrastructure while adhering to government regulations.

  • ISTS Transmission Licensees: Entities authorized to operate and maintain inter-state transmission systems.

  • Generating Companies: Particularly those developing dedicated transmission lines connected to ISTS substations.

The authorization grants powers similar to those held by telegraph authorities under the Indian Telegraph Act, 1885. This includes the right to install and maintain telegraph lines, posts, and related infrastructure.

Yes, the government may impose specific conditions or restrictions to ensure compliance with safety standards, environmental regulations, and public interest. These conditions are outlined in the written order.

The authorization does not have a fixed validity period. It remains effective as long as the specified conditions are met and the project adheres to regulatory requirements.

The average processing time ranges between 60 to 90 days, depending on the complexity of the project and compliance with regulatory requirements.

Yes, applications can be submitted through the National Single Window System (NSWS), a digital platform designed to simplify and expedite the approval process.

Yes, private entities engaged in the business of supplying electricity or developing transmission infrastructure can apply for this authorization, provided they meet the eligibility criteria.

Violation of the conditions or restrictions imposed by the government may result in penalties, revocation of the authorization, or legal action as per applicable laws.

No, this authorization can be sought for both new projects and the expansion or maintenance of existing infrastructure, provided the activities fall within the scope of the authorization.