Environmental Clearance (EC) is a mandatory environmental approval required for mining minor minerals such as sand, stone, gravel, ordinary earth and other minor minerals in a mine lease area of 0–5 hectares, as applicable under environmental regulations. The purpose of this approval is to ensure that mining activities are carried out in an environmentally responsible and sustainable manner while minimizing adverse impacts on air quality, water resources, soil, biodiversity and nearby communities. The applicant is required to submit the prescribed application form along with relevant project details, mining lease information, an approved Mining Plan, a Pre-Feasibility Report and other supporting documents to the concerned authority. The competent environmental authority examines the proposed mining activity, assesses its potential environmental impacts and may prescribe specific environmental protection and monitoring conditions. The applicant must obtain the required Environmental Clearance before commencing mining operations and comply with all applicable conditions throughout the project period.
Application for EC for Mining of Minor Minerals of Mine Lease (0-5 HA) - Form-2
What is Application for EC for Mining of Minor Minerals of Mine Lease (0-5 HA) - Form-2
Who Can Apply for Application for EC for Mining of Minor Minerals of Mine Lease (0-5 HA) - Form-2
Individual mining leaseholders.
Proprietorship firms.
Partnership firms.
Private Limited Companies.
Public Limited Companies.
Registered mining leaseholders.
Authorized project proponents holding valid mining rights.
Documents Required forApplication for EC for Mining of Minor Minerals of Mine Lease (0-5 HA) - Form-2
- Duly filled Environmental Clearance Application Form (Form 1M).
- Approved Mining Plan.
- Pre-Feasibility Report (PFR).
- Copy of Mining Lease Deed / Letter of Intent (LOI).
- Approved District Survey Report (DSR).
Act and Rules
Regulations and Guidelines for Recombinant DNA Research and Biocontainment, 2017
Guidelines for the conduct of Confined Field Trials of Regulated, Genetically Engineered (GE) Plants, 2008
Standard Operating Procedures (SOPs) for Confined Field Trials of Regulated, Genetically Engineered (GE) Plants, 2008
Environmental Risk Assessment of Genetically Engineered Plants: A Guide for Stakeholders, 2016
Guidelines for the Environmental Risk Assessment of Genetically Engineered Plants, 2016
Guidelines for the Safety Assessment of Foods Derived from Genetically Engineered Plants, 2008
Role of Shamkris and Process of Application for EC for Mining of Minor Minerals of Mine Lease (0-5 HA) - Form-2
Shamkris adopts a results-oriented approach to ensuring compliance with the mandatory requirements for obtaining the Application. With a simple and guided methodology, Shamkris helps organizations achieve the necessary application in a timely and cost-effective manner. Shamkris offers 100% support in advisory, guidance, and compliance, ensuring smooth processing for obtaining the application.
The Application acquisition process described below:
Advisory for the document required
Preparation of documents as per application & list of documents.
Certificate File
Inspection by the department if required
Certificate department
Certificate issued
Yearly Compliance if Applicable
Renewal when due
Who can issue Application for EC for Mining of Minor Minerals of Mine Lease (0-5 HA) - Form-2

FAQ
It is a mandatory environmental approval required before commencing minor mineral mining activities in a lease area of 0–5 hectares.
Individuals, proprietorship firms, partnership firms and companies holding valid mining rights or authorization can apply.
Yes. Prior Environmental Clearance is required for minor mineral mining projects, subject to applicable exemptions.
Form 1M is the prescribed application form for Category B2 minor mineral mining projects up to 5 hectares under the central EIA framework.
Yes. An approved Mining Plan is an important supporting document.
Yes. A Pre-Feasibility Report (PFR) must be submitted along with the prescribed application.
Generally, no public hearing is prescribed for an individual Category B2 project of up to 5 hectares.
The competent environmental authority processes and grants clearance as prescribed under the applicable regulations and current judicial directions.
No. The required prior Environmental Clearance must be obtained before commencing mining operations.
Mining without the required clearance may result in regulatory action, penalties, suspension of operations or other legal consequences.